Fall Decommissioning
Request your decommisioning requirements for the end of the season.

 

 

Fall Decommissioning Checklist

 

Please completely fill out and send the commissioning sheet at your earliest convenience. We schedule haul outs and decommissioning in the order they are received. Keys and / or combinations must be available at the time of haul out. Dock lines and fenders must be on board so we can protect your hull at the dock. When picking an approximiate haul out date please take into consideration that we need two or three days to complete the decommissioning process after the boat is hauled out.

Mechanical Decommissioning Engine and driveline
Fresh (potable) Water systems
Raw (salt) Water systems
Hull
Steering
Battery (s)
GenSet
Air Conditioner
  Decommission Other: 

Owner
  Your Name:
  Address:
  City/State/Zipcode:
  Home Phone:
  Work Phone:
  Cell Phone:
  Email:
Rigging Decommissioning Remove Sails
    Leave onboard
    Deliver to Hallett Canvas & Sail
Canvas
Unstep mast
Store mast
Prepare mast for transport
Service Roller Furling
Clean & Lubricate Winches

Vessel
  Boat Name:
  Make:
  Length:
  Combination:  Key: 
Dates
  Please enter approximate dates.
  Haul Out Date:
(requires 2-3 days prior for decommissioning preparation)
General Decommissioning Haul boat to storage
Haul boat to transport
   Transporter's Name:
Pressure wash bottom
Shrink wrap boat w/access door
Varnish brightwork
Inspect keel bolts tighten if necessary
Fill Propane or CNG tank exchange
Clean and oil exterior teak
Inspect fire extinguishers, recharge or replace
Signature
  Work cannot be started until authorized with
  (submission of this form constitutes signature)
  ALL WORK IS CASH ON DELIVERY
  Your Name: *
  Date: *
Additional Comments or Requests:
Agreement and Terms:
* = Required field